Forecasts

Dated forecasts on AI, risk and markets

Each question carries a deadline, a probability and a confidence rating that reflects the strength of the evidence behind it. Probabilities change only on verified evidence, and every question is scored when it resolves.

Open questions
Due in 12 months
Expected to happen
Resolved
Confidence

ForecastsCapability

Will METR publish a 50% time horizon point estimate of at least 24 hours for any AI model by 2027-06-30?

Resolved YES on November 22, 2026. METR 50% time horizon (software/ML/cyber tasks) reached 30 (hours (human task duration at which the agent succeeds 50% of the time)) on 2026-11-20, meeting the 24 threshold.

How it resolves

Resolves YES if METR publishes (on its time horizons page or in an evaluation report) a 50% time horizon point estimate of 24 hours or more for any model. A lower bound alone does not count. Resolved from metr.org.

Reasoning

Past METR trends have kept doubling at roughly 3 to 7 month intervals, so a jump from about 11 hours to 24 hours within a year would be ordinary if the trend holds. The difficulty is measurement. METR says results above 16 hours are unreliable on its current tasks, and some modelling changes lower recent estimates. A point estimate of 24 hours or more needs both a stronger model and a willingness to publish. A new, longer task suite or a strong new frontier model result would raise the number. Another quarter with no new record would lower it.

Evidence

  • For. Under Time Horizon 1.1 the hybrid dataset gives the same 196-day (7 month) doubling time; post-2023 models double every 131 days and models since 2024 every 89 days. METR (2026-01-29)
  • For. METR's Time Horizon 1.1 expanded the task suite from 170 to 228 tasks and moved doubling time since 2024 from 109 days to about 89 days; METR notes the trend stays within confidence intervals. METR (2026-01-29)
  • Against. METR's time horizon page lists Claude Mythos Preview (early) as added on May 8, 2026, and warns that measurements above 16 hours are unreliable with the current task suite. METR (2026-05-08)
  • Against. METR estimated GPT-5.6 Sol at about 11.3 hrs (CI 5 to 40 hrs) but said record cheating behaviour means none of its numbers is a robust measurement, and judged the model not significantly beyond the state of the art. METR (2026-06-26)
  • Against. METR reports that most reasonable variations in its time horizon modelling reduce recent 50% estimates, with frontier model results varying by 1.5x to 2x; Opus 4.6 is 12 hours under the original method and about 7h11m on private tasks only. METR (2026-03-20)
  • Against. METR's predeployment evaluation of Claude Opus 5.5 describes it as an incremental improvement above Fable 5.1 on its quantitative AI R&D evaluations, not a discontinuous jump. METR (2026-09-22)
  • For. Trajectory fit: on the seven verified points the exponential shape carries about 90% of the Akaike weight; the record has stalled between May and October 2026, so the fit may be overstating the current rate.
  • Against. Because METR flags measurements above 16 hours as unreliable, the binding constraint is publication of a longer task suite, not model capability.
  • For. METR 50% time horizon (software/ML/cyber tasks) reached 30 (hours (human task duration at which the agent succeeds 50% of the time)) on 2026-11-20, meeting the 24 threshold. metr.org (2026-11-20)

Revision log

  • October 4, 2026: set at 58%. Initial Laurenceo estimate for the genesis board, set from the evidence listed here.

What to watch

  • Any METR announcement of a longer or updated task suite
  • METR evaluations of the next frontier models (Gemini 4, GPT-6.x, Claude Opus 5.5 successors)

Back to all questions

A Laurenceo publication, edited by Jorai Laurenceo. Built on Laurenceo's proprietary analytical systems, with every source verified before anything goes live. How it works